Quantcast
Channel: DAG – azure365pro.com
Viewing all articles
Browse latest Browse all 16

How to create a Database Availability Group in Exchange 2013

$
0
0

Well, Creating Database Availability Group (DAG) Became much more simpler,

But configuring it properly is the best part to have it efficiently working.
So lets see how to create a 2 node DAG ,

NOTE **Am not going to Describe about load balancing for Client Connectivity in this blog

I will describe my environment now

I have 2 AD sites

Every AD site has Exchange Servers

image

image

========================================================
First we will prepare the Environment for the DAG
———————————————————————————-
I will have my Primary LAN . Will add a Replication LAN ,for my DAG replication for all the nodes which am planning to add in DAG

image

Verify my NIC binding are Correct

Advanced – Advanced Settings

image

1.Primary Network

2.Replication Network

image

Make Sure they are in a Different Class of IP

Primary Network –

image

Replication Network –

*No Default Gateway

*No DNS Servers Set

*Add a persistent Route for all the nodes with the Replication NIC’s

Replication NICs should ping with other replication NIC’s – So that DAG replication will happen through these NIC’s

Port Used : 64327

image

Now there is no Single point of failure on my LAN
If my replication network fails it can failover to the production network. vice versa.

When creating a DAG with Mailbox servers running Windows Server 2012 in an Active Directory environment with Windows Server 2008 R2 directory servers, you must pre-stage the cluster network object before adding members to the DAG. For detailed steps, see Pre-Stage the Cluster Network Object for a Database Availability Group.

See

http://technet.microsoft.com/en-us/library/dd351172.aspx

Lets See How to pre stage a Cluster CNO object.

Open ADUC – New Computer Account

image

Enter the DAG Name

image

Disable the Account

image 

Give Full Control for Exchange Trusted Subsystems

image

Add the First Node Computer account and Give Full Control

Note -  Choose Object types to Select Computer Accounts

image

image

Apply the Permissions

Reference link -

Pre-Stage the Cluster Network Object for a Database Availability Group

==========================================================================
Now we will  Create a DAG ,

 

Login to EAC –Servers – Database Availability Groups – Choose New

image

 

Specify

* DAG name

* Witness Server Name

* Witness Location

Add Two DAG ips’ (Static IP for the DAG )

1 for Primary Site

1 for DR site

if you have different subnet or different class of ip on either Sites.
Have Two IP address for the DAG so that DAG resource can be online while failover on either sites
If you have only one Subnet , then you can have only one Ip address for the DAG

image
Now my DAG Configuration is Ready

Add members to it.

Choose Manage DAG Membership

image

image

Adding the members

image

Now you can add the other DAG memberwhere it should get added without any issues.

image

Great !! Now your DAG is ready !!

 

See

How to Add Database Copies in Exchange 2013

Satheshwaran Manoharan

Publisher of CareExchange.in
I have been supporting Microsoft Exchange for some years . Thanks for your visit . Please share you thoughts via Comments
For Feedback or Improvements : Admin@careexchange.in
Thank you

LinkedIn Google+ 


Viewing all articles
Browse latest Browse all 16

Trending Articles